Today was the day which marks the end of a 2½ month stint with Side Effects Software Inc. And today, we also had to present what we did during this stint. As required, the final renders, shot-breakdown and of cause presentation slides which summarize what we did. Initially, the presentation will be held at 10am but was postponed to later time, 12pm as Steven was coming in to see the presentation.
I was first to present, follow by Jia Bao then Bryan and lastly, Lu Sheng. Everybody in the office were present and saw our presentations. Aliza and the rest were impressed and all of us did well. We had a good presentation. Some of the interns or SESI, bought lunch for everyone and we get to order what we like. After all the hype and lunch, Ari bid farewell to us, probably the last time we will see him. We also kind of had a very very small biding farewell session with the rest of the interns and also to thank them for their great help throughout this stint. A very very small farewell session because we are still going back tomorrow.
After so long, I had not been telling/showing what I did for the project, maybe some bits and parts of here and there of my project scattered among different post. I have decided to do a very long post at the end to summarize the entire project, from R & D to post-production. Will do the posting as soon as I prepare all the stuff and compose them neatly. Be right back....
No comments:
Post a Comment